电话:
+86 (0512) 65829739
传真:
+86 (010) 6788 5057
电子邮件:
orders@antibodies-online.cn

ADRP 抗体 (AA 286-437)

Cited in 1 publication. The 小鼠 单克隆 anti-ADRP antibody (Clone 2C5A3) (ABIN1724874) specifically detects ADRP in IHC 和 ELISA. The antibody is reactive with 人 samples.
产品编号 ABIN1724874
发货至: 中国
Contact our Customer Service for availability and price in your country. Contact Info

Our Local Distributor

中国
北京 101111
No. 88 KeChuang 6th Street
Beijing Economic Technological Development Area
Room 801-803
4A Biotech Co.,Ltd.
Tel +86 (0512) 65829739 传真 +86 (010) 6788 5057

Quick Overview for ADRP 抗体 (AA 286-437) (ABIN1724874)

抗原

See all ADRP (PLIN2) 抗体
ADRP (PLIN2) (Perilipin 2 (PLIN2))

适用

  • 141
  • 32
  • 23
  • 2

宿主

  • 84
  • 52
  • 5
  • 1
小鼠

克隆类型

  • 82
  • 60
单克隆

标记

  • 59
  • 12
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
This ADRP antibody is un-conjugated

应用范围

  • 94
  • 64
  • 44
  • 43
  • 40
  • 19
  • 19
  • 19
  • 14
  • 14
  • 10
  • 7
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
Immunohistochemistry (IHC), ELISA

克隆位点

2C5A3
  • 抗原表位

    • 48
    • 15
    • 8
    • 6
    • 5
    • 4
    • 3
    • 3
    • 3
    • 2
    • 2
    • 2
    • 2
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    • 1
    AA 286-437

    原理

    PLIN2 Antibody

    纯化方法

    Purified antibody

    免疫原

    Purified recombinant fragment of human PLIN2 (AA: 286-437) expressed in E. Coli.

    亚型

    IgG1
  • 应用备注

    ELISA: 1/10000

    限制

    仅限研究用
  • 状态

    Liquid

    缓冲液

    Purified antibody in PBS with 0.05 % sodium azide.

    储存液

    Sodium azide

    注意事项

    This product contains Sodium azide: a POISONOUS AND HAZARDOUS SUBSTANCE which should be handled by trained staff only.

    储存条件

    4 °C,-20 °C

    储存方法

    Store at 4°C short term. Aliquot and store at -20°C long term. Avoid freeze/thaw cycles.
  • Shepherd, Cocks, Tipton, Ranasinghe, Barker, Burniston, Wagenmakers, Shaw: "Preferential utilization of perilipin 2-associated intramuscular triglycerides during 1 h of moderate-intensity endurance-type exercise." in: Experimental physiology, Vol. 97, Issue 8, pp. 970-80, (2012) (PubMed).

  • 抗原

    ADRP (PLIN2) (Perilipin 2 (PLIN2))

    别名

    PLIN2

    背景

    The protein encoded by this gene belongs to the perilipin family, members of which coat intracellular lipid storage droplets. This protein is associated with the lipid globule surface membrane material, and maybe involved in development and maintenance of adipose tissue. However, it is not restricted to adipocytes as previously thought, but is found in a wide range of cultured cell lines, including fibroblasts, endothelial and epithelial cells, and tissues, such as lactating mammary gland, adrenal cortex, Sertoli and Leydig cells, and hepatocytes in alcoholic liver cirrhosis, suggesting that it may serve as a marker of lipid accumulation in diverse cell types and diseases. Alternatively spliced transcript variants have been found for this gene.


    分子量

    48 kDa

    基因ID

    123

    UniProt

    Q99541

    途径

    Regulation of Lipid Metabolism by PPARalpha, Lipid Metabolism
You are here: